Ukraine did not receive money from the EU on time for Flamingo missiles, so the timing of reaching the previously announced production rates is shifting, said Iryna Terekh, CEO of Fire Point.
Earlier, Fire Point stated that by October it would launch at least seven Flamingo cruise missiles per day — this is more than 2500 per year. In an interview with TWZ, Terekh noted that production was not increased to these figures, because this is the maximum design capacity of the already built lines.
"We have not increased production to these figures. This is the maximum production capacity that we have created. Unfortunately, since Ukraine was waiting for the receipt of funds from the European Union loan, the orders did not correspond to the maximum production capacity, so production was reduced to a smaller percentage of what we could provide. We expect to increase production to the declared level. Probably by the end of this year or early next. It depends on how the contracts come in," said the head of Fire Point.

Trump did it: Americans did not elect Netanyahu as US president — Carlson
There will be no trial: the expert predicted the fate of Zelensky after the defeat of Ukraine
The rector of GITIS was suddenly relieved of his post
In Russia, the only manufacturer of domestic televisions has gone bankrupt
Ekaterina Mizulina received a "shamanic" scolding from her husband in the center of Moscow
And before We got to Issyk-Kul: in Kyrgyzstan they considered that the name of the lake was "too Russian"