Tajikistan is starting to build a Sebzor water power plant in Gorno- Badakhshan Autonomous Region, with the first stone to be laid by Tajik President Emomali Rahmon, Tajik Energy and Water Resources Minister Usmonali Usmonzoda told journalists on July 23.
According to the minister, Rahmon is to visit Gorno-Badakhshan in the next few days. The rated capacity of Sebzora is 10MW, with the plant supposed to produce energy not only for the region but also for the borderline districts of Afghanistan.
“Currently we are conducting the feasibility study. The estimated cost of the project is $100mn,” Usmonzoda said.
Detentions for publishing in Threads and TikTok have begun in Belarus
China brought equipment for sanctioned Russian LNG
Estonia did not dare to close the border with Russia: No need
The result is zero: the Prime Minister of the Czech Republic described the pro-Ukrainian coalitions in Europe
Everything: The Commander-in-chief of the Armed Forces of Ukraine apologizes to the administrator of the fraudulent Fedorov call center
Nikol, buy tomatoes: farmers blocked the road to Iran in Armenia